Showing posts with label drusy. Show all posts
Showing posts with label drusy. Show all posts

Thursday, June 21, 2007

In the Pink...Drusies, Too!

I"ve still been busy, but have stayed at the studio late to make a few things so that the website doesn't start to look bare! I forced myself to use the marvelous lampwork beads above, created by Lynn Nurge, although I was enjoying having them where I could look at them everyday. They are one of my favorite glass colours, a pink opal. The almost teal green center of the flower and swirl on the swirl beads is lovely, too. I mixed the lampwork with green apatite beads that have a touch of teal in them and with rose quartz. The bracelet is made so that the flower should be on top of the wrist, almost like a wrist corsage and can be seen on our lampwork bracelets page as can another new lampwork bracelet with soft shell-like opal lampwork, too. I've also been fortunate enough to find some good drusy beads, so I have been trying to use some of them, also. I love to mix them with dendrite opal as you can see here above and below in the earrings and bracelet. The translucent greyish-looking rondelles in the bracelet are actually ocean jasper. The huge focal is a drusy, of course, and so are the biggest beads near the toggle clasp. These can be seen on our Drusy Jewelry page.
The bracelet below is made of dark pink opals and lampwork beads mixed with sterling silver. The pink opals are really a bit darker in real life than the picture actually indicates, and the lampwork beads are luscious. I chose opals with dark inclusions because they were also those that were the darkest pink, and I wanted them to match the wonderful lampwork beads.
Finally, the bottom earrings are made with the "bumpy" lampwork beads that went with the set of lampwork from the first flower bracelet above. They are on our Lampwork Earrings page.





Meanwhile, the pool looks very inviting and I need to work on my tan (yes, I tan, but I don't burn), but it seems that there is always something else to do. In about 2 weeks, we are having a large part of our downstairs carpeting ripped up and wood floors put down; we're putting tile and a new shower in our bathroom and a Jacuzzi tub upstairs.
What a mess it will be! But at least it will give me an excuse to go early to the office/studio and come home late.